ALS EE Topoff Meeting
Second/fourth Tuesday at 10:00 am.
A Message from Hiroshi
This site is already in Linda's directory.
We are waiting for a new scanner that takes multiple pages at once.
As soon as it comes, non-electric pages will become online.
Project Schedule
2004.04.16
Recent Meetings
2004.04.06
- F. Sannibale,"Cleaning of Parasitic BunchesCleaning of Parasitic Bunches
in Booster Ringsin Booster Rings" PDF
- G. Stover,"Comparison of Booster ring "Bump magnet" B field measurements vs.
calculations @ 1.552 and 1.995 Gev" PDF
2004.03.09
- S.Kwiatkowski and G.Stover, "Do we need to modify the booster fast extraction kicker for Top-Off
operation?" PDF.
- G.Stover,"1.95 Gev Upgrade Progess Report",
doc,
PDF.
2004.01.13
- D.Robin:First Experiments with STXM Users.
A short note and a copy of his presentation are here.
- W.Barry:Schedule for FY2004. (
excel,
mpp,
pdf)
- D.Robin:Radiation
- G.Stover:Priority list for the first.
2003.12.16
- Ken Baptiste on Electron Gun, Linac, & Booster RF Systems.
His note will be scanned for WEB.
- Slawek Kwiatkowski has postponed his talk as many were not there.
2003.12.02
2003.11.04
2003.10.07